Managing high-voltage lines

/Managing high-voltage lines
  • Day:

    02 April
  • Start Time:

    1.45pm - 3.15pm
  • Stream:

    Professional Development Installer

A network response to how effective the use of the Volt-Var response in grid connected inverters has been and what that will mean in the short term and longer term as penetration of renewables into the grid increases. An overview will provide what technical conditions or restrictions will be required to connect to the grid in future and renewable saturation increases.