Case Study – Demand Response on difficult sites

/Case Study – Demand Response on difficult sites
  • Day:

    02 April
  • Start Time:

    1.45pm - 3.15pm
  • Stream:

    Professional Development Installer

Rural and remote sites pose unique challenges for solar and battery installers.
 
Issues such as long underground cable runs to multiple sheds and buildings, Voltage rise, poor internet connections and long distances for service calls make quoting and installing difficult.
 
Learn how Reposit and partner installers are solving some of these problems for difficult sites.